1
Resources · FAQ

Frequently Asked Questions

37 short, direct answers organized along your buying journey — from the first sizing question to spare parts years later. Where a question deserves depth, the answer links to the full guide in Selection Guides or the Knowledge Library.

37 questions

01 · Selection & Sizing 5

Before anything else — what crane, what size, what class.

QWhat information do you need for an accurate quotation?

Six inputs cover most projects: lifting capacity (t), span (m), lifting height (m), duty (lifts per hour, hours per day), power supply (voltage / frequency) and the working environment (indoor or outdoor, dust, temperature). Building drawings or photos help a lot.

Detailed checklist per product: Overhead Cranes · Gantry Cranes · Portable Gantry Cranes · Jib Cranes · Scrap Magnets · Grab Buckets

QSingle girder or double girder — which one do I need?

Rule of thumb: a single girder crane is lighter and more economical and covers most workshop jobs at moderate capacity, span and duty. A double girder crane wins for heavier capacities, wider spans, harder duty cycles and when you need maximum hook height.

Full answer: Choosing Between Single and Double Girder Cranes →

QWhat duty class (FEM / ISO) should I specify?

Duty class describes how hard the crane works — load spectrum times operating time — from light workshop duty up to continuous steel-mill duty. Getting it right protects both lifetime and price: over-specifying costs money, under-specifying costs the crane.

Full answer: Selection of ISO Standard for Crane Working Class →

QHow do I determine the right capacity and span?

Capacity = your heaviest regular load plus the weight of any below-the-hook device (magnet, grab, spreader) plus a sensible margin — don't size the whole crane for a once-a-year lift. Span = the distance between runway rail centers, normally your column spacing minus clearance. Lifting height = floor to highest hook position — watch the roof trusses.

Our engineers check all three free of charge; the wheel load calculator then gives your building designer the runway loads.

QCan the crane be customized to my building and process?

Yes — customization is our normal mode of work: non-standard spans, low-headroom designs, outdoor duty, magnets, grabs and other below-the-hook devices, and special cranes for steel mills, scrap yards, paper mills and shipyards.

See Crane Customization →

02 · Pricing & Quotation 5

Straight answers on money — what drives the price and how quoting works.

QHow much does an overhead crane cost?

The honest answer: it depends on five factors — capacity & span, duty class, component brands, certification requirements and trade terms. As a rough indication for standard configurations: a 5 t single girder overhead crane typically falls around US$6,000–15,000 FOB, a 10 t single girder around US$9,000–20,000, a 20 t double girder around US$25,000–60,000; heavy-duty and special cranes are quoted per project.

Your exact price arrives itemized within 24 hours — see what to include in your inquiry.

QWhy do quotations from different suppliers vary so much?

Four usual reasons: steel quantity (girder plate thickness varies enormously between designs), duty-class honesty (a crane quoted as A5 but built as A3 is cheaper — until it wears out), component brands (hoist, motors, electrics), and what's included (freight, certification, spares, support). Ask every supplier for an itemized quote and compare line by line — ours comes itemized by default. Be cautious with a price far below the pack: the steel alone has a market price.

QHow fast do I get a quote, and how long is it valid?

A recommended configuration and budget price within 24 hours of receiving capacity, span and lifting height. Formal quotations stay valid for 30 days; steel prices and exchange rates move, so after that we reconfirm — usually the same day.

QWhat payment terms do you accept?

Most orders run T/T: a deposit with the order, balance before shipment — goods ship once the balance clears. Irrevocable L/C at sight is accepted, though we'll tell you honestly: L/C means higher bank fees and slower payment, and many buyers get the same security for less with T/T plus SGS pre-shipment inspection. Smaller orders can simply pay in full by T/T. A proforma invoice states the exact terms before you pay anything.

QIs there a minimum order? Which trade terms do you quote?

One crane is a normal order — no minimum; we even take spare-parts-only orders. We quote EXW, FOB, CIF or CFR routinely, and DAP / DDP for many destinations (recent DDP deliveries include Mexico and Malaysia) — availability confirmed per destination country. Send your port and we'll include freight so you compare true landed cost, not just factory price.

03 · Factory Verification & Trust 5

The due-diligence questions — ask them; we'd rather you verify than wonder.

QAre you a factory or a trading company?

A manufacturer. Henan Kino Cranes has built overhead and gantry cranes for 18+ years on a production base of about 150,000 m², with 500+ production and testing machines, 500+ employees, a dedicated R&D center and an annual capacity of 3,000 cranes — 5,000+ projects delivered to 120+ countries. And you don't have to take our word for it: visit the factory, take a live video tour, or send an inspector.

See the production system: Quality & Certification →

QCan I visit or video-tour your factory?

Yes, and we encourage it. Book a visit 3–5 working days ahead; we assist with the invitation letter (allow about a week for issue) and arrange reception locally. Can't travel? A live video tour walks you through the production lines and your own order in progress — several recent orders, Indonesia among them, were verified entirely by video tour plus regular production updates.

Preview first: factory & product videos →

QDo you accept third-party inspection (SGS / BV / TÜV)?

Yes — and we often recommend it: SGS, BV, TÜV or any inspector you appoint, for pre-shipment inspection or loading supervision. The fee (typically a few hundred US dollars) is borne by the buyer, and for many orders T/T plus SGS inspection replaces a costly L/C outright. Agree the agency, scope and timing with us before ordering so testing slots into the production schedule.

QHave you delivered to my country?

Very likely — 5,000+ projects across 120+ countries: the Middle East, Southeast Asia, South America, Africa and Europe. Tell us your country and application and we'll share reference cases like yours, with client details anonymized.

Browse projects: customer cases →

QWhat certifications do your cranes carry?

FEM design standards, CE marking for Europe, ISO 9001 quality management, EAC for the Eurasian union and RoHS. Certificate copies come with quotations on request, and destination-specific documentation is prepared per order.

Details: Standards & Certifications →

04 · Order & Production 4

What happens between your deposit and the container leaving the factory.

QWhat is the typical lead time?

Typical production time: 4–6 weeks for standard single girder cranes, 8–10 weeks for double girder; complex custom cranes are scheduled per project — large metallurgical systems can run several months. Add sea freight for door-to-door planning. The schedule is written into the contract and tracked with progress updates.

QHow do I follow production progress?

As standard, you receive test photos and videos before packing — proof of your crane running, on record before it ships. For major orders we provide regular progress updates through production, and a live video call at any point is fine. You don't need to fly here to know exactly where your crane is.

QWhat tests are done before shipment?

Every crane passes our five-gate QC and a final test sequence: no-load running of every motion and powered function tests of all mechanisms and limit switches — with photos and videos sent to you before packing. Need a witnessed load test? It can be arranged — in person, by your third-party inspector or on video; scope and cost are agreed before production starts.

The full system: 5-Step Quality Control →

QCan I inspect the crane before it ships?

Three ways: come and witness the load test in person, appoint a third-party inspector, or join by live video — we run the full test on camera and send you the recording either way.

05 · Technical & Installation 5

The technical questions we hear most before and during installation.

QWhat type of wire rope is used on the crane?

High-strength steel wire rope matched to the hoist capacity and duty class by the design standard — the exact construction and diameter are stated on your crane's GA drawing and spare-parts list.

Full answer: What Type of Wire Rope is Used on Crane? →

QHow is the crane controlled — pendant, remote or cabin?

Three standard options, freely combinable: pendant pushbutton (economical), radio remote (most popular — the operator moves freely), and cabin control for heavy or continuous duty. Variable-frequency drives give smooth acceleration in all cases.

Full answer: How Many Control Methods Does Bridge Crane Have? →

QWhat power supply can you build for?

We build to your grid: 380V/415V at 50Hz, 440–460V at 60Hz and other national standards, with control circuits at safe low voltage (36/48V). State voltage and frequency in your inquiry — it affects motors, panels and certification.

QHow do I install the runway rails correctly?

Rail gauge, straightness and level tolerances decide how smoothly the crane runs — and how fast wheels wear. Rail clamps must be installed to procedure before the crane goes up.

Full answer: How To Install Crane Track Rail Climps? →

QDo you provide installation and commissioning support?

Three working modes: your team installs with our documentation plus live video guidance — free of charge, with mechanical and electrical engineers on the call (most common); we dispatch an engineer on a per-day basis with travel, lodging and visa borne by the buyer (rates quoted per project); or we coordinate with a local rigging company you hire. We recommend the right mode with your quotation.

See Installation & Services →

06 · Shipping & Delivery 6

Export logistics — packing, documents, transit and delivery to your port.

QHow is the crane packed for ocean freight?

To seaworthy standard: girders wrapped and weatherproofed at contact points, components sealed in export cases with rust protection, containers loaded with engineered lashing — and every container is photographed before the doors close.

Full walkthrough with photos: Export Sea Packaging →

QDo I need a fumigation certificate for the wooden cases?

No. We pack in fumigation-free plywood cases, which are exempt from ISPM-15 — no fumigation treatment or certificate is required at your destination port.

More: Plywood Cases & Steel Frames →

QHow long does sea freight take?

Typical port-to-port times from China: Southeast Asia 7–15 days, Middle East 15–25, Europe 28–40, Africa 20–45, South America 35–50 — season and routing move these. For CIF/DAP orders we book the vessel and share the schedule as soon as space is confirmed.

QWhich countries do you ship to? Which trade terms?

5,000+ projects delivered to 120+ countries — the Middle East, Southeast Asia, South America, Africa and Europe. Send your destination port and we quote FOB, CIF or DAP as you prefer.

QWhat if my girder is longer than a container?

Girders beyond 40' container length ship on open-top or flat-rack containers, or as break-bulk cargo on conventional vessels — carried on engineered transport saddles with a lashing plan. Routine for us: spans over 30 m travel this way.

More: Container Loading & Lashing →

QWhat shipping documents will I receive?

The standard export set: packing list, commercial invoice, bill of lading and certificate of origin, plus quality/test certificates as your customs requires. We confirm your country's exact checklist before shipment.

More: Shipping Marks & Export Documents →

07 · Arrival & Acceptance 3

The goods are at your port — here's how to receive them properly.

QWhat should I check when the goods arrive?

Count cases against the packing list before signing, photograph any external damage, and open-check within 7 days with written feedback against the packing list. If anything is missing or damaged, send photos — the container photos taken before closing establish responsibility fast, and replacements ship immediately (urgent missing items go by air; it's an established process, not a favor).

QWho does the installation and commissioning on site?

Same three modes as installation support: your team with our documents + live video guidance, our engineer on site, or a local rigging company we coordinate with. The most efficient pattern, proven across projects: your team completes mechanical installation, wiring and foundations, then our engineer arrives for commissioning — days on site instead of weeks.

QWhat are the acceptance criteria after installation?

The standard sequence: no-load runs of every motion, then a rated-load test, checking deflection, speeds, brakes and limit switches against the acceptance sheet supplied with the crane. Where your local regulations require a witnessed overload test, we support it — agree the scope with us and your inspector in advance. Pass, sign, lift.

08 · After-Sales, Warranty & Parts 4

The crane will run for 20 years — here's who stands behind it.

QWhat warranty comes with the crane?

Standard warranty is 12 months from commissioning completion, capped at 18 months from the B/L date — stated in your contract, covering manufacturing defects in structure and components. During warranty we resolve issues by remote diagnosis, replacement parts or, where needed, an engineer visit — and wear parts stay available long after.

QHow do I order spare parts?

Send the crane number from the nameplate plus a photo of the part — common wear parts (contactors, brake pads, wheels, ropes) dispatch within 3–7 days from stock or production, and urgent warranty parts go by air. A recommended spares kit can ship with the crane.

See Spare Parts →

QHow often should the crane be inspected?

Daily operator checks (hooks, ropes, brakes, limit switches) plus scheduled periodic inspections — and whatever statutory intervals your local regulations impose. Our checklist is a solid baseline.

Full answer: Overhead Crane Inspection Checklist →

QThe crane has a fault — how do I get support?

Send the crane number from the nameplate plus photos or a video of the fault — our engineers respond within 24 hours, remote diagnosis first, and most issues are identified the same day. The usual fix is a part from stock with video-guided replacement; anything bigger, we arrange an engineer visit.

Question not covered here? Ask an engineer directly on WhatsApp — we answer technical questions within 24 hours, usually much faster.

Still have questions?

Send your crane type, capacity and span — our engineers reply within 24 hours with answers and a budget price.

TO TOP

+8619037303917

[email protected]

0086-373-5968887

GIFA & METEC Indonesia 2026 Cranes | Booth 7407