Light duty gantry crane is ideal for lifting and transferring small and lightweight loads for both indoor and outdoor applications. Under normal circumstances, the lifting weight is below 20 ton (common ones are 1 ton, 2 ton, 3 ton, 5 ton, 10 ton, 15 ton and 20 ton gantry cranes), the span is within 35m, and there is no special requirement for use. It is advisable to choose light duty gantry crane.
The light duty gantry crane comes in multiple configurations and designs to suit varied needs of customers, including single girder gantry crane, semi gantry crane and portable gantry crane system.
Technical Data
Loading Capacity
0.5~20t
Lifting Height
3~30m or customized
Lifting Speed
Single speed: 3~8 m/min or customized
Variable speed: 1/10 m/min or customized
Span
3~35m
Left Cantilever
0~4m or as require
Right Cantilever
0~4m or as require
Lifting Mechanism
Wire rope hoist or electric chain hoist
Work Duty
M3~M5
Power Supply
AC-3Phase-220/230/380/400/415/440V-50/60Hz
Control Method
Ground handle control(Push button), wireless remote control, cabinet control
1-20 ton light gantry crane with hoist is widely used for the workshop, station, port, warehouse and , etc. It is used for loading and unloading between fixed span and it can handle many kinds of materials, such as steel structure, precast concrete, glass, plastic, etc.
Buyer Guide For Gantry Cranes
1. Selection of gantry crane
Comply with the relevant regulations of GB/T14406-1993 and GB5905-86 for general gantry cranes.
Under normal circumstances, the lifting capacity is less than 50t, the span is less than 35m, and there are no special requirements for use, the single main beam type should be selected. If the width of the gantry leg is required to be large, the working speed is high, or the heavy and long pieces are often lifted, the double girder gantry crane should be selected.
2. Span and cantilever length of gantry crane
The span of the gantry crane is an important factor affecting the quality of the crane itself. In the selection, the span should be minimized under the premise of meeting the equipment use conditions and meeting the span series standards.
3. The principle of determining the wheelbase
(a) It can meet the stability requirements of the gantry along the direction of the crane track;
(b) The overall dimensions of the goods should be able to smoothly pass through the flat steel frame of the outriggers;
(c) Note that the wheelbase B is proportional to the span S. Generally, the wheelbase B=(1/4-1/6)S.
Fourth, the gantry crane spacing size is determined
During work, there should be a certain amount of space between the external dimensions of the gantry crane and the passage of goods and transport vehicles in the yard to facilitate loading and unloading operations. When loading and unloading within the span, the general transport vehicle should keep a distance of more than 0.7m from the door leg. When the spreader is not working, there should be a distance of more than 0.5m from the transport vehicle, and when the goods pass through the door legs, there should be a distance of more than 0.5m.
This kind of manufacturing usually uses a variety of cranes, including High working class, high lifting capacity crane, low working class, low lifting capacity crane.
The entire garbage crane is designed with A8 extra heavy duty according to the actual operating conditions. According to the working environment, humanized design, anti-corrosion design are added and foreign advanced technologies are absorbed and optimized.